11/10/04: Construction work completed ahead of schedule. Site is now available again. However, site will be closed for additional construction 11/25/04 through 11/28/04.
Driving directions:
Go to Google Local for driving directions to/and from any location, and to find points of interest>>
Official address 1126-11th St.
Across from Cal EPA/CARB building.
How to find the charging station location once you have found the site:
The eighth floor is the roof of the garage. Not covered parking.
Things to do:
Downtown Sacramento, CARB.
Pay Parking details:
Free parking with City of Sacramento EV Parking Permit. Otherwise, pay the same rate as all other cars.
Comments:
There is another site on the 2d floor of the same garage. 8th floor is primarily for CARB vehicles, but may be used by public vehicles if space is available.
Rating: 4 Raters: Tom Dowling
by Tom Dowling, 11/03
by Tom Dowling, 11/03
by Tom Dowling, 11/03
Equipment model and serial number info:
Inductive, from left to right:
1) TAL S0207117 cable 411
2) TAL S0210013 cable 433
3) TAL S0010090 cable 854
4) TAL S0210017 cable 460
5) TAL S0204105 cable 247
6) TAL S0210019 cable 436
7) TAL S0207114 cable 461
TAL S0010090 3rd from left new paddle no cable serial number, then cable serial 854
7 TAL 9 ICS200B 1 DS50
Conductive, from left to right:
1)ICS200B cfg TR0600 ser TR-12-00-013 49.4 kwh
2) ICS200B cfg TR0607 ser TR-07-00-033 57.8 kwh
3)ICS200B cfg TR0600 ser TR-12-00-026 37.0 kwh
4) ICS200B cfg TR0601 ser TR(illegible, defaced) 2379 kwh
5) ICS200B cgf TR0601 ser TR-05-00-013 1029 kwh
6) DS50 cfg S2-10 ser DP00-01-0054 no voice
7) ICS200B cfg TR0600 ser TR12-09-047 1351 kwh
8) ICS200B cfg TR0600 ser TR1098013 no voice
9) ICS200B cfg TR0607 ser TR12-00-039 2013 kwh
10) ICS200B cfg TR0600 ser TR12-00-055 29.7 kwh
Meter readings: See above for readings 5/25/04
Generated on Sunday, 9/4/2005, at 15:23:51 from evcnnorcalmaster.fp5. Template revised 11/25/05.
Status history:
11/10/04: Construction work completed ahead of schedule. Site is now available again. However, site will be closed for additional construction 11/25/04 through 11/28/04.
11/7/04: Location down until about 11/12/04 due to construction.
All OK as of 5/25/04.
Previous problems repaired, but second SPI from the left will not charge.