Lat: 38.53293 (N 38°31.976') (N 38°31'58.6") (WGS 84 datum) Lon:-121.74843 (W121°44.906') (W121°44'54.4")(V: Determined by GPS site visit.)
Status:
11/7/09: SPI DOWN.
5/09: Now includes Tesla charging station.
Comments:
2/04: SPI may be blocked during events or other busy times. SPI space is bordered on both sides by ICE spaces. Parking Services will ticket, but will not tow.
9/03: SPI now has signage.
6/8/03: SPI lacked signage at last visit. TWD.
Most locations on the UC Davis campus require parking permits, obtainable at ticket machines at the entrances to the lot.
Parking permits are required Monday through Friday 7am-10pm
Most EV spaces are marked for 4 hours maximum parking
UC Davis locations should be marked restricted parking, pay parking.
There is a request in progress to make EV parking free on the campus.
Driving directions:
See the
Campus map. The chargers are near the VP1 label at M15 on the map.
Enter the campus via the main UC Davis exit from I 80.
Go to Google Local for driving directions to/and from any location, and to find points of interest.
How to find the charging station location once you have found the site:
2002-2-7: Charging stations are immediately
outside the main entrance to the new parking structure, near the new UCD
Center of the Arts. The parking structure
is visible from I-80.
-- Tom Dowling site visit 1/29/02.
Nearby charging locations:
Use the EVChargerMaps system to find nearby charging sites, and to leave comments about this site.
Things to do:
Many events at the Mondavi Center. Pay parking at peak times.
Rating:
4 Raters:
Tom Dowling
by Tom Dowling
SPI charger and sign, by Tom Dowling, 9/03
by Tom Dowling
Generated on Sunday, 1/30/2011, at 10:46:58 PM PT from evcnall.fp7.
Revision History:
8/24/10: Changed to OK.
11/7/09: Changed to SPI DOWN; added 208V info.
5/09: Tesla station installed, replacing Avcon.
4/30/09: Updated charger location note.
2/15/04: Added comments.
12/27/03: Added photo 2.
10/29/30: Added new map, deleted signage photo. See comments.
9/3/03: Revised photos to include SPI.
7/3/03: Revised photos
6/8/03: Added comments, pay parking, restricted.
6/30/02: twd: Signage photo added
5/19/02: Zseq chgd from c10 to 7.
5/2/02: Added per TDdb.
Do you see any discrepancies or have any information for us about this page?
Please add comments, using the EVChargerMaps system. Click here.