Lat: 37.87022 (N 37°52.213') (N 37°52'12.8") (WGS 84 datum) Lon:-122.27007 (W122°16.204') (W122°16'12.2")(V: Determined by GPS site visit.)
Status:
Avcon connector has missing safety cover (can see actual contacts).
Comments:
2/24/02: Michael Schwabe visited and confirmed
operational. Pay parking. Bart station is one block away on Shattuck.
City parking garage Web site. 2002-1-21: Dave Raboy 11/25/2001, discovering a press
release from 3/7/2000.
Driving directions:
There is also an entrance on Addison Street to better serve the theater and arts district.
Go to Google Local for driving directions to/and from any location, and to find points of interest.
How to find the charging station location once you have found the site:
Charging stations are on the 4th floor.
Nearby charging locations:
Use the EVChargerMaps system to find nearby charging sites, and to leave comments about this site.
Things to do:
This garage is convenient to downtown shops, theaters, restaurants and other businesses and cultural attractions.
Rating:
4 Raters:
Earl Killian 10/07
Equipment model and serial number info:
Gen 2+ SM5276P0102004C
from the City of Berkeley press release.
Garage entrance view
Signage, with hours for conductive spot (by Michael Schwabe)
Generated on Sunday, 1/30/2011, at 10:44:41 PM PT from evcnall.fp7.
Revision History:
5/18/08: Added driver comments, charging location, todo information, restricted parking information, pay parking information.
7/5/04: Removed LPI, installed SPI. (EAA project.)
3/36/04: Updated City of Berkeley URL for the site, corrected address spelling..
9/10/03: Editing correction to comments.
7/3/03: Revised photos.
9/7/02: corrected press release link per Arthur Keller {twd}
5/21/02: Zseq chgd from 4 to 1.
4/30/02: added per TDdb
Do you see any discrepancies or have any information for us about this page?
Please add comments, using the EVChargerMaps system. Click here.