EV Charger News

Charging Station Site Number 90802_2


Status as of 1/30/2011: In service.

Important! There may be more recent status comments in the "I Was There" reports and comments.
Click here to view or to add a comment.


Hyatt Long Beach

200 S. Pine Ave.
Long Beach, California 90802

Site ID:  90802_2      Thomas Bros. Maps Page and Grid™:   825-D1


Pay parking.  Details:  Valet parking. $1.00 per half hour, $11 max per day.

Charging facilities at this site:
Inductive:
  1 - Large paddle
Nominal supply voltage for this site:  208V

MAP OF CHARGING STATION LOCATION
Drag the map with your mouse, or double-click to center.
Google maps tour and tutorial>>
Go to Google Local for driving directions and points of interest>>

Lat:  33.76370 (N 33°45.822') (N 33°45'49.3")   (WGS 84 datum)
Lon:-118.19168 (W118°11.501') (W118°11'30.1")
         
(T: Adjusted to apparent location on Tiger map.)

Driving directions:
Hotel entrance is on NE corner of Shoreline Drive and Pine Ave., just S of the Convention Center.
Go to Google Local for driving directions to/and from any location, and to find points of interest.

How to find the charging station location once you have found the site:
Enter self-parking structure at main entrance to Hyatt, fourth parking slot on right.
-- Barry Pataky 9/15/2001

Nearby charging locations:

Use the EVChargerMaps system to find nearby charging sites, and to leave comments about this site.

Things to do:
10/12/02: Pedestrian causeway from hotel's 2nd floor crosses over to Shoreline Village.



Check out the "I Was There" reports for this site, or leave one of your own, using the EVChargerMaps system. "I Was there" reports are important, even (or perhaps especially) if all is well. Please submit a report whenever you visit a charging station.
You can also use this feature to find nearby charging stations.
Back to top of page
View the EV1 Club information for this site. (Historical -- no longer updated.)

Generated on Sunday, 1/30/2011, at 10:49:44 PM PT from evcnall.fp7.

Revision History:
6/27/07: Chgd L/L per Precisifier. - Gil
12/31/05: Moved Comments to Ppk.- Gil
10/14/02 Added DrivDir, ToDo, adjusted LL per site visit. --Gil
9/20/02: Added comment. -- GD
Do you see any discrepancies or have any information for us about this page?
Please add comments, using the EVChargerMaps system. Click here.

Back to top of page